Our online learning content was developed in collaboration with CSR Gyprock

Learning and assessment resources for CPC31220

Our on-line CPC31220 Certificate III in Wall and Ceiling Lining learning and assessment resources feature an RPL Tool, and learning resources created in collaboration with CSR Gyprock and industry, including the Association of Wall and Ceiling Industries.

There are over 1000 technical assessment tasks, 120 different activities, an electronic log-book, over 500 multi-media video lessons, SWMS, plans and specifications, Technical Data Sheets, and operating manuals for plasterboard equipment and tools.

All assessment comes pre-validated by industry, quality checked for compliance, and includes high quality mapping to the units of competency.

There are a number of key changes in the new qualification when compared to the old one:

  • An increase in the number of required units from 26 to 29.
  • New core units including CPCCCA3014 Construct and install bulkhead,  CPCCCA3026 Assemble partitions, CPCCWC3003 Install dry wall passive fire-rated systems and CPCCWC3004 Install suspended ceilings.

Here is a list of units available:

Core units

CPCCCA3014 Construct and install bulkheads

CPCCCA3026 Assemble partitions

CPCCOM2001 Read and interpret plans and specifications

CPCCCM2012 Work safely at heights

CPCCOM1012 Work effectively and sustainably in the construction industry

CPCCOM1013 Plan and organise work

CPCCOM1014 Conduct workplace communication

CPCCOM1015 Carry out measurements and calculations

CPCCPB3001 Fix standard plasterboard wall sheets

CPCCPB3002 Fix standard plasterboard ceiling sheets

CPCCPB3003 Fix battens

CPCCPB3004 Fix wet area sheets

CPCCPB3005 Fix ceiling sheets to external protected areas

CPCCPB3006 Fix fibre cement board

CPCCPB3007 Apply levels of finish standards to planning and inspection of own work

CPCCPB3008 Mix plastering compounds

CPCCPB3009 Finish plasterboard joints manually

CPCCPB3010 Manually sand plaster work

CPCCPB3012 Cut and fix paper-faced cornices

CPCCWC3003 Install dry wall passive fire-rated systems

CPCCWC3004 Install suspended ceilings

CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry

Elective units

BSBESB301 Investigate business opportunities

BSBESB407 Manage finances for new business ventures

CPCCCA3001 Carry out general demolition of minor building structures

CPCCCA3010 Install windows and doors

CPCCCM2006 Apply basic levelling procedures

CPCCCM2007 Use explosive power tools

CPCCCM2008 Erect and dismantle restricted height scaffolding

CPCCCM3001 Operate elevated work platforms up to 11 metres

CPCCPB3014 Install bulk insulation and pliable membrane products

CPCCPB3016 Install and finish columns

CPCCPB3017 Rectify faults in drywall applications

CPCCPB3018 Use vacuum and electric sanding equipment to finish plaster work

CPCCPB3019 Inspect equipment for serviceability

CPCCPB3020 Match, mitre and install cast ornamental cornices

CPCCPB3022 Use mechanical jointing equipment to finish joints

CPCCPB3027 Install ceiling insulation products

CPCCSP3003 Apply trowelled texture coat finishes

CPCCSP3005 Install pre-cast decorative mouldings

CPCCWC3001 Install and finish plasterboard and fibre cement sheeting to curved wall and ceiling substrates

error: Content is protected !!